優惠套餐

照片素材(圖片): Architectural blueprint paper project plans on desk table, tool for engineer contractor building interior design drawing and VR glasses, industry virtual technology, Architect workplace concept

素材編號 : 102177129 查看全部

Architectural blueprint paper project plans on...[102177129],此圖庫照片素材(圖片)具有藍圖,建築師,建造的關鍵詞。此照片素材是Sorapop / (No.1550179)的作品。您可以購買圖小從影像尺寸從S至XLUS$5.00以上的尺寸。註冊成為免費會員後,您可以下載帶有浮水印的圖片以確認畫質及使用收藏夾的服務。 查看全部

Architectural blueprint paper project plans on desk table, tool for engineer contractor building interior design drawing and VR glasses, industry virtual technology, Architect workplace concept 102177129

Architectural blueprint paper project plans on desk table, tool for engineer contractor building interior design drawing and VR glasses, industry virtual technology, Architect workplace concept

  • 1:1
  • 4:3
  • 4:5
    (8:10)
  • 3:2(6:4)
  • 自訂
    :

縮放

* 您可以拖曳以移動圖片

S
  • 640 x 427px
  • 22.6 x 15.1cm (72dpi)
JPG US$5.00
M
  • 2000 x 1334px
  • 16.9 x 11.3cm (300dpi)
JPG US$15.00
L
  • 4000 x 2669px
  • 33.9 x 22.6cm (300dpi)
JPG US$30.00
XL
  • 7360 x 4912px
  • 62.3 x 41.6cm (300dpi)
JPG US$50.00
Ex 追加擴展許可證 +US$30.00
合計:
[免費]編輯素材

只要使用免費編輯工具,
就算尚未購買素材亦可嘗試圖片的編輯、加工
詳細內容請點確認

照片素材(圖片): Architectural blueprint paper project plans on desk table, tool for engineer contractor building interior design drawing and VR glasses, industry virtual technology, Architect workplace concept的關鍵詞